The substrate to which the flooring system is being applied has been laid to a standard building specification.
There is no water or damp ingress.
The site is under the control of the applicator for the full duration of the preparation, application and curing process.
The specified system is laid according to the manufacturer’s specification.
Specific products must be applied by an approved Dekster flooring applicator.
Important
Always visit the site and carry out a site inspection before providing a quote.
FOR ANY TECHNICAL INFORMATION OR PRODUCT TRAINING PLEASE CONTACT OUR TECHNICAL INFORMATION CENTRE
Colour variation visible whilst applying:
CAUSE
Solution
Product ordered in parts and not one batch for the entire job
Double check m2 and order correctly
Using dirty rollers or brushes and mixing buckets
Clean tools are the sign of an efficient and professional application team
Not vacuuming the floor properly before applying sealers especially at the junction of wall and floor
An approved professional flooring applicator will always have a well maintained industrial vacuum cleaner
Small pin holes / bubbling appears on the surface:
CAUSE
Solution
No primer used, air entrapment in the small voids move to the surface causing pin holing
Always follow manufacturer’s specification. If substrate is extremely porous apply 2 primer coats
Activator and base mixed too vigorously (high speed festo drill).
Mix on low speed
Applied too soon after mixing and not allowing air to move to the surface
Allow mixed product to stand for a few minutes before applying
Not using a spike roller when specified
Use specified application tools (refer to data sheets)
The specified spread rates are not achieved:
CAUSE
Solution
Product too cold (stiff) when applied
Apply in temperatures between 15 – 30 ºC
Incorrect application tools
Check you are using the correct application tools (refer to data sheets)
Applying product too thick
Apply at specified spread rates (refer to data sheets)
Substrates porosity is excessive
Site inspection should alert you to this, notify client and specify in quote that extra primers may be necessary
Brush and / or roller lap marks showing:
CAUSE
Solution
Inferior brushes or rollers used
Use specified application tools (refer to data sheets)
Inexperienced applicators
Never rush applying product, always cut in and roll working as a team and do not allow the applicator cutting in to run ahead of the roller applicators. Rollers must always cross roll and check the applied area has no missed spots before moving on
White milky marks appear:
CAUSE
Solution
Substrate contaminated with moisture through rising damp or ingress through walls due to faulty DPC membranes
Incorrect building details
Never lay floors on substrates with a moisture content above 14%
Delamination:
CAUSE
Solution
Weak or faulty substrate
Oil or chemical contamination
Lack of proper preparation
Always inspect floor for hollow spots or oil contamination
Coating does not set (harden):
CAUSE
Solution
Not mixing activator and base
Follow detailed mixing instruction
Not mixing activator and base for specified duration
Follow standard mixing times (refer to datasheets)